Argentina・Latin America Photovoltaic Power Station Project
2026/11/12 15:40:30

Customer: Large renewable energy engineering company in Mendoza Province, Argentina (Renewable Energy Constructor)

Customer pain points: The photovoltaic park covers a large area with scattered construction sites, involving extensive cable trench excavation, foundation leveling, and sand/stone transportation; the remote site locations require frequent scheduling of multiple machines, resulting in high fuel and trailer transportation costs; the desert environment is hot and dusty, placing stringent demands on hydraulic system reliability.

Solution: The customer purchased two-head busy equipment in bulk and deployed it to various photovoltaic work zones; the rear end of the equipment excavates cable trenches and foundation pits, while the front end handles sand/stone transport, site leveling, and topsoil removal; the equipment features optimized cooling and dust-proof structures tailored for South American operating conditions, making it well-suited to the local hot, arid desert environment.

Implementation results: A single machine can perform multiple earthmoving operations, reducing the number of auxiliary equipment units and drivers required; the project has cumulatively completed over ten thousand meters of cable trench excavation, with equipment utilization consistently maintained above 85%, leading to a significant reduction in overall earthmoving construction costs.
Customer feedback: It performs reliably under hot, dusty outdoor conditions, with one machine capable of handling trenching, loading, and site leveling for photovoltaic farms.

↑
QR Code